Buell Cottage – Chamberlain

May 16th, 2010

Project Completed Fall 2009 – Overlooks Muscongus Bay with Monhegan Island silhouetted in the distance.

Field Stone wall acts as a boundary for the front part of the property.

The openness of the main house was enhanced with full cathedral ceilings from front to back with the addition of structural beam-work over the kitchen.  This feature gave us a surface to hang the main lighting for the kitchen and Island areas.

Gryga Residence – Bremen

May 10th, 2010

Ocean Front Home on Greenland Cove completed last year.

Holm Garage – Damariscotta, Maine

May 10th, 2010

This is a project we completed this past winter.  It is a two car garage with a workshop above. There is a elevated walkway that connects the new structure to the existing house.  The building was ballooned framed with deeper then usual TJI’s floor joists to allow for a column free first floor.  All the exterior trim and siding is knotty cedar.